I've never worked with expanding foam before so putting in the new flotation foam in the ski-boat today was pretty fun. It took about 2 hours to pour all the foam. I've been ready for it since last week but was waiting for the delivery. During the foam pouring I also installed the new battery box. After the foam hardened (about an hour) I sawed off all the foam muffin top blobs and brought it down to the level of the floor with a Sur-Form tool which worked great but took a little while.
An added bonus today was the 60 degree temps which are a welcome change from last weeks freeze. This may be Asheville's last warm week before winter. It was SNOWING on Saturday for crying out loud. What a great break that this week in particular is going to be warm. Tomorrow I'll start laying down the 18oz roving for the new fiberglass floor.